LiFePO4 Battery OEM & ODM: How the Process Works
Most OEM projects fail at the specification stage, not the production stage. If the continuous current, charge profile or communication protocol is left vague, the first container arrives with units that do not match the customer’s system.
The Six Steps
| Step | What happens | What you provide |
|---|---|---|
| 1. Specification | Voltage, capacity, current, BMS, case, connector | Load profile and target market |
| 2. Quotation | Unit price, MOQ, tooling, lead time | Quantity and destination |
| 3. Sample | Built to spec, tested, shipped | Feedback and approval |
| 4. Validation | Capacity, BMS, communication, packaging | Test results or acceptance |
| 5. Production | Batch build with pre-shipment check | Label artwork, manual |
| 6. Shipping | UN38.3, MSDS, CE/RoHS, invoice, packing list | Forwarder details |
What Can Be Customised
- Label and packaging: brand, model naming, manual, carton printing.
- Case: colour, case format (standard/thin/slim), terminal type.
- BMS: continuous current, communication protocol, low-temperature cut-off, balancing strategy.
- Connectors: Anderson, XT60, ring terminals, custom harness.
- Accessories: charger, solar panel, mounting bracket, carry bag.
What Drives MOQ
Changing a label is cheap and usually needs a small MOQ. Changing a case mould, BMS firmware or a connector harness adds tooling and setup, which raises the minimum. The same battery in a different label can often ship from a smaller batch than a new mechanical design.
Documentation
Every OEM order ships with UN38.3, MSDS, CE and RoHS declarations matching the model, plus packing list and commercial invoice. If the destination market requires additional certification, raise it at the specification stage — not after production.
Frequently asked questions
OEM means we build to your specification under your brand; ODM means we propose an existing design that you brand. ODM is faster and cheaper; OEM gives you more control.
Sample typically 2–4 weeks after specification sign-off; production depends on the batch and whether tooling is involved. Confirm the schedule in the quotation.
Yes, if the cell is available and suits the pack design. We will confirm the maker, model and lead time before quoting.
No. We configure the BMS to the agreed specification and provide the parameters; the firmware remains the BMS supplier’s IP.
Related reading
See the manufacturer selection guide, cell verification checks, or the 48V supplier page.
Need a reliable LiFePO4 battery supplier?
Wholesale pricing · OEM/ODM · Flexible MOQ · Global shipping