Testing a Container Before Shipment: What to Ask For

Quick Summary: A battery pre-shipment inspection has 3 parts: a sample test on the product, a carton and pallet check, and loading supervision. For a 1,000-unit lot, ask for the 80-unit sample result, the capacity in Ah, and the container seal number before you release the balance.
12V 100Ah LiFePO4 battery on a navy cover for a pre-shipment inspection guide

A pre-shipment inspection has three separate parts

Testing a container before shipment means three checks, not one. The product sample test measures capacity and BMS behavior. The packing check looks at cartons, labels and pallets. Loading supervision records the container condition and the seal. A report that only contains photos of cartons answers one of the three questions.

The three parts fail in different ways. A pack can pass a capacity test and still ship with the wrong UN label. A carton can be correctly printed and still collapse under a second pallet. A clean container can be loaded with a seal number that does not match the bill of lading. Each part needs its own record.

Inspection stage Question it answers Record to ask for Failure it catches
Product sample test Does the finished lot meet capacity and BMS limits? Test sheet with sample size, current, cutoff, Ah and temperature Capacity shortfall, BMS cutoff fault
Packing check Will the carton and pallet survive the route? Carton dimensions, weight, drop test result, label photos Crushed corners, wrong label, missing serial
Loading supervision Was the right cargo loaded in a sound container? Container number, seal number, stow photos, ambient temperature Seal mismatch, wet floor, damaged doors

The sample size comes from ISO 2859-1

ISO 2859-1 defines “sampling procedures for inspection by attributes”. The standard links a lot size to a sample size code letter. A lot of 1,000 units at general inspection level II gives code letter J and a sample of 80 units. That is the number to put in the purchase order, not a supplier’s promise to “check a few”.

The AQL sets the acceptance number. One workable plan uses AQL 1.0 for functional defects and AQL 2.5 for visual defects. At a sample of 80, AQL 1.0 accepts 2 defective units and rejects at 3. AQL 2.5 accepts 5 and rejects at 6. The numbers define a risk that both sides can price; they do not guarantee zero defects.

If the buyer needs zero functional defects, the AQL plan is the wrong tool. A 100% functional test on every unit costs more and takes longer. The purchase order should say which route applies, because a supplier cannot meet both a 100% test and an AQL sample price.

Defect class AQL Sample size Accept Reject
Functional (capacity, BMS, voltage) 1.0 80 units 2 3
Visual and label 2.5 80 units 5 6
Critical (safety, short circuit, swelling) 0.65 80 units 1 2

A capacity test at 0.2C takes five hours per unit

A 12V 100Ah pack is tested at 20A for five hours at 25°C, with a cutoff at 10V. The datasheet rates the pack at 1,280Wh and a minimum capacity of 98Ah. A delivered capacity below 98Ah is a shortfall, even if the pack still runs a small load. The test record should show start voltage, end voltage, elapsed time, ambient temperature and Ah delivered.

A 48V 200Ah pack uses 40A for five hours and a cutoff at 40.5V. Its rated energy is 9.6kWh. A 0.2C test is slow, so a practical plan tests a subset: three units per model plus any unit that failed the open-circuit voltage check. The subset should be drawn at random from the finished lot, not picked by the factory.

UN38.3 is a design-type transport test; a capacity test is a batch performance check. The two documents answer different questions, and neither replaces the other. A UN38.3 summary that covers the model belongs in the document pack even when the sample test is clean.

Model 0.2C current Cutoff voltage Rated energy Minimum capacity Test time
12V 100Ah 20A 10V 1,280Wh 98Ah 5 h
12V 200Ah 40A 10V 2,560Wh 195Ah 5 h
48V 200Ah 40A 40.5V 9,600Wh 200Ah 5 h

BMS protection tests need a pass/fail line for each function

A BMS functional test checks that the protection board opens and closes the current path at the stated limits. The report should have one line for overcharge, one for over-discharge, one for short circuit, one for temperature and one for cell balance. A report that says “BMS normal” without those lines cannot be checked.

For a 12V 100Ah pack, the datasheet lists a fast charge voltage of 14.6V, an operating range of 8.8V to 14.6V and a low protection voltage of 8.8V to 10V. The test should confirm the charge disconnect near the upper limit, the discharge disconnect near the lower limit, and recovery after a recharge. The exact trigger values belong in the purchase order, because BMS firmware varies by model.

Short-circuit and temperature tests need a test fixture and a controlled load. A factory that clips a wire across the terminals for a video is not running a repeatable test. Ask for the fixture, the current path and the recorded cutoff time.

Function Test method Pass record
Overcharge Charge to the BMS cutoff at 25°C, hold for 10 minutes Charge MOSFET opens, no swelling, recovery after 10 minutes
Over-discharge Discharge at 0.2C to the low cutoff Discharge MOSFET opens, recovery after a 10A recharge
Short circuit Apply a bolted short through a calibrated fixture Cutoff within the supplier’s stated time, no case damage
Temperature Charge at 0°C and at the upper charge limit Charge stops at 0°C; record the temperature at which it resumes
Cell balance Measure cell delta after a full charge Delta inside the supplier’s spec, recorded in mV

Carton, label and pallet checks catch errors before the container closes

A label error is easy to miss because it does not affect the battery. A 12V 100Ah pack is rated at 1,280Wh, so it sits above the 100Wh threshold and ships as Class 9 dangerous goods, normally under UN3480 when the battery travels alone. The carton needs the model, nominal voltage, capacity in Ah, energy in Wh, UN number, proper shipping name, the Class 9 label and orientation arrows. The serial or batch number should match the packing list.

The carton check is physical. Measure a sample carton, weigh it, and compare the result to the packing list. A 12V 100Ah pack weighs about 10kg, and a carton that is 500g light may be missing a terminal cover or a document pack. Drop one carton on a corner and one on an edge, then open it and inspect the pack for cracked cases or loose terminals.

The pallet check covers cartons per layer, layers per pallet, stretch wrap, corner boards and desiccant. A 20ft container has 33.2 m³ of space and about 28.3 tonnes of cargo capacity, so the pallet plan has to fit both the volume and the payload. A pallet that is 10cm too tall can stop the last row from entering the door.

Sourcing LiFePO4 batteries for your market?LINEX supplies 12V-48V lithium batteries, ESS and solar kits - wholesale, OEM/ODM, flexible MOQ.
Check What to record Why it fails
Label artwork Photo of the front, side and shipping mark Wrong UN number or missing Class 9 label
Carton weight Net and gross weight for 5 cartons Missing accessory or extra packing
Drop test Corner and edge drop from the carton spec height Cracked case or loose terminal
Pallet build Cartons per layer, layers, total height Load shifts or will not enter the door
Desiccant Quantity per carton and per pallet Condensation in a hot or humid route

Loading supervision records the container condition and the seal

Loading supervision starts with the empty container. The inspector checks the CSC plate, the container number, the floor, the roof, the side walls, the door gaskets and the smell. A container that carried a volatile chemical can leave a vapor that attacks labels and cartons. A floor with delamination can fail under a 1,000kg pallet.

The inspector then records the load. Photos should show the empty container, the first row, the half load, the full load, the closed doors and a close-up of the seal. The seal number goes on the report and the bill of lading. A seal photo without the container number is not traceable.

The load itself needs a pattern. Cartons should not touch the doors, the weight should be spread across the floor, and lashing should not press on terminals. If the container is loaded in summer, record the ambient temperature and the container interior temperature before loading. A pack that has been sitting in the sun should cool before it goes into the box.

Loading check Record Red flag
Container condition CSC plate, floor, roof, door gaskets, smell Wet floor, holes in the roof, chemical odor
Container number Photo of the door and the CSC plate Number does not match the booking
Seal Close-up photo and number on the report Seal number missing from the bill of lading
Stow pattern Photos at first row, half load and full load Cartons against the doors, uneven weight
Lashing Straps, bars or airbags with contact points Lashing pressing on terminals or vents
Temperature Ambient and container interior at loading Pack surface above 45°C

The report should reach you before the balance payment

Book the inspection to finish at least three working days before the vessel cut-off. A draft report should arrive within 24 hours, and the final report should be in hand before the balance payment is released. A supplier who sends only a WhatsApp photo of a pallet has not provided an inspection.

The payment term should name the report as a condition. If the report shows a failed sample, the buyer needs a remedy: 100% sorting, rework, replacement, a hold on the shipment or a credit. The remedy belongs in the purchase order, not in a later email argument.

A clean report records the state of the lot on the inspection date; the warranty covers the pack after installation. Keep both documents, because a claim may ask for the inspection record and the serial number together.

What to put in the purchase order

Write six items into the purchase order: the inspection standard, the test list, the sample plan, the acceptance criteria, the report format and the remedy for a failed lot. Add the document pack: UN38.3 test summary, MSDS, packing list, label artwork and the container loading plan.

The LiFePO4 import guide covers the document side of the same shipment. The container loading article works out how many 12V 100Ah packs and 48V 200Ah modules fit in a 20ft box. The certificate guide explains what a UN38.3 summary, an MSDS and a CE declaration actually contain. For the product baseline, the 12V 100Ah battery page lists the capacity, current, size and weight used in the test plan. The factory vetting guide covers the audit that should come before the first inspection.

A pre-shipment inspection costs little compared with a rejected container, and the report is the first document a claim will ask for. The report should name the sample, the test, the result and the seal. If it does not, the buyer is paying for photos.

Frequently asked questions

Does a pre-shipment inspection replace UN38.3 testing?

No. UN38.3 is a design-type test on the cell and battery model. A pre-shipment inspection checks the finished lot. The UN38.3 summary should be on file before the inspection, and the inspection report should reference the model it covers.

How many units should be capacity tested?

A workable plan is three units per model plus any unit that fails the open-circuit voltage check. For a high-value order, test the full ISO 2859-1 sample. A capacity test takes five hours per unit at 0.2C, so the lab capacity and the inspection window decide the number.

Can the factory inspect its own shipment?

A factory can run a final check, but a second-party report is weaker than a third-party report. A letter of credit or a marketplace dispute may ask for an independent inspection body. The factory should still be present to open cartons and answer test questions.

What usually makes a lot fail?

Label and carton errors are easy to miss because they do not affect the battery. Capacity shortfall and BMS cutoff errors are less frequent but more expensive. A report that checks both the product and the artwork catches the cheap failures before they reach the port.

Who pays for the inspection?

The inspection company quotes a fee per man-day, and the buyer pays it in the standard arrangement. The fee is separate from the product price. Put the cost and the scope in the purchase order so the supplier does not book a cheaper, narrower inspection.

Can I release the balance against a photo?

A photo does not show the sample size, the capacity result or the seal number. Release the balance against the report and the shipping documents. If the report is clean and the seal matches, the photo is a supplement, not the evidence.

Sources: ISO 2859-1:1999 sampling procedures for inspection by attributes, general inspection level II and AQL tables (ISO, checked 2026-11-12); IATA Guidance Document for Lithium Batteries and Sodium ion Batteries 2026 (UN3480, PI 965, UN38.3 test summary, checked 2026-11-12); LINEX 12V 100Ah product page (12.8V, 100Ah, 1,280Wh, 100A continuous, 8.8V to 14.6V operating range, 0°C to 50°C charge, -20°C to 60°C discharge, 6,000 cycles at 25°C and 80% DoD, about 10kg, 332 x 172 x 218mm, checked 2026-11-12); LINEX 12V 200Ah product page (2,560Wh, 195Ah minimum capacity, checked 2026-11-12); LINEX 48V 200Ah product page (9,600Wh, 40.5V cutoff, -20°C to 65°C discharge, 78kg, checked 2026-11-12); LINEX container loading guide (33.2 m³ and about 28.3 tonnes of cargo in a 20ft container, checked 2026-11-12); TÜV Rheinland pre-shipment inspection service page (independent inspection scope, checked 2026-11-12). Last updated 2026-11-12.